An epic is a large body of work, delivered over several sprints. It holds stories (requirements from the user’s point of view), tasks (any other work) and bugs, which all sit on the same level, so none of them can be the parent of another. Each of those can be split into subtasks, the lowest level. Biggest first: epic, then story, task or bug, then subtask.
Epic, story, task, bug and subtask side by side
Jira calls these work types (formerly issue types). Each sits on a hierarchy level: 1 for epics, 0 (standard) for stories, tasks and bugs, and -1 for subtasks. A work item can only have a parent on the level directly above it. Sources: Atlassian’s guides to work types, the work type hierarchy, linking to a parent, epics as board cards and swimlanes.
| Work type | Level | Purpose | Typical size | Who creates it | Parent and children | On the board |
|---|---|---|---|---|---|---|
| Epic | Level: 1 | Purpose: A large goal, split into smaller work | Size: Several sprints | Created by: Anyone with create permission | Family: Parent of stories, tasks and bugs | Board: Epics panel and swimlanes; a card only on company-managed kanban boards set to show it |
| Story | Level: 0 | Purpose: A requirement from the user’s point of view | Size: One sprint or less | Created by: Anyone with create permission | Family: Child of an epic; parent of subtasks | Board: A card |
| Task | Level: 0 | Purpose: Any other work | Size: Like a story | Created by: Anyone with create permission | Family: Child of an epic; parent of subtasks | Board: A card |
| Bug | Level: 0 | Purpose: Something that doesn’t work as intended | Size: Like a story | Created by: Anyone with create permission | Family: Child of an epic; parent of subtasks | Board: A card |
| Subtask | Level: -1 | Purpose: One step of its parent | Size: Part of its parent | Created by: The same, once subtasks are enabled | Family: Child only | Board: A card, grouped under its parent by swimlanes |
Business spaces (formerly Jira Work Management) start with only Task and Subtask, and Jira Service Management uses its own types such as Incident and Service request. This guide covers software spaces.
When to use an epic, story, task, bug or subtask
- Epic when the work has one goal but needs several sprints and several people or pieces to deliver it.
- Story when the result is something a user can see or do, and it fits in one sprint.
- Task when the work is needed but no user would describe it: setup, upgrades, documentation, research.
- Bug when something that should already work doesn’t.
- Subtask when the work is one step of a single story, task or bug, and finishing it means nothing on its own.
An illustrative example, with fictional names: the epic Sign in with company accounts holds the stories As an admin, I can connect our identity provider and As a member, I can sign in with my company account, the task Register the app with the identity provider, and the bug Session ends after five minutes in Safari. The second story splits into the subtasks Add the sign-in button and Test the sign-in callback.
Story vs task: same level, different purpose
Stories and tasks behave the same way in Jira: same level, same parent (an epic), same children (subtasks), and both can carry story points if your fields allow it. The difference is what they describe.
- Story: Atlassian describes stories as “short requirements or requests written from the perspective of an end user.” See epics, stories and initiatives.
- Task: in Jira’s words, “a task represents work that needs to be done.” It is the type for work that isn’t a user requirement or a defect.
Because they share a level, a story can’t be the parent of a task, or the other way round. If a piece of work is big enough to need its own stories, it is an epic.
Task vs subtask
A subtask is one step of a single story, task or bug, at level -1. Subtasks are the only work type that can’t have children, so a subtask can’t have subtasks of its own. Use a subtask when the step only makes sense inside its parent; use a task when the work stands on its own or belongs directly to an epic. The Jira subtasks guide shows where Jira displays them.
Change a story to a task, or a task to a subtask
- Story, task or bug to another standard type: open the work item, select the work type icon at the top left, and choose the new type. See updating a work item’s details.
- Task, story or bug to subtask: select ••• > Convert to subtask, pick the parent and the subtask type, choose a status if asked, fill any required fields, then Finish. Jira blocks this while the work item has subtasks of its own, and subtasks must be enabled.
- Subtask to task or story: select ••• > Convert to work item, pick the type, a status if asked and any required fields, then Finish. See creating and converting subtasks.
- Many work items at once: select them in the backlog, on the board or in the list view, choose Bulk change > Move work items, keep the same space and pick the new type. You need the relevant space permissions. See changing the type of several work items.
The subtasks guide covers deleting subtasks and the other subtask changes.
Epics and the levels above them
Atlassian calls an epic “a large user story that can be broken down into a number of smaller stories,” and says epics are almost always delivered over a set of sprints. See what is an epic. Creating epics, adding work to them and reporting on them are in the Jira epics guide.
Jira has three levels by default. Premium and Enterprise sites can add levels above epic, such as Initiative, but never between epic and story; the Jira hierarchy guide explains how.
Check that every story sits under the right epic
Picking the right type is half the job; the other half is the Parent field. Boards group one level at a time and the timeline stops at stories, so a story under the wrong epic, or a task with no epic, is easy to miss.
Cascade is a Chrome extension that shows your epics as a tree inside your Jira Cloud tab: each epic, its stories, tasks and bugs, and their subtasks. Open any work item’s details beside the tree. No Jira administrator has to install it, though your employer’s browser policies may restrict extensions.
Pick your epics and check what sits under each one. The tree is free today.
Epic vs story vs task FAQ
Which is bigger, an epic or a story?
An epic. It sits one level above stories (level 1 versus level 0), holds the stories, tasks and bugs that deliver it, and is almost always delivered over several sprints.
What is the difference between a story and a task in Jira?
Both sit on the same level and can hold subtasks. A story describes something from the end user’s point of view; a task is any other piece of work, such as setting up a server or updating documentation.
Can a story be the parent of a task?
No. Stories, tasks and bugs share the standard level, and a parent must sit on the level directly above its child. Only subtasks sit under a story or task.
Can an epic contain another epic?
No. A parent must sit on the level directly above its child. To group epics, Premium and Enterprise sites can add a level above epic, such as Initiative.
Do stories and tasks need an epic?
No. The Parent field is optional, so a story or task can exist without an epic.
How do I change a story to a task in Jira?
Open the story, select the work type icon at the top left of the work item, and choose Task. To change many work items at once, use Bulk change > Move work items and keep the same space.
Should a piece of work be a task or a subtask?
Make it a subtask when it is one step of a single story, task or bug and only makes sense inside it. Make it a task when it stands on its own, could be planned in a different sprint, or belongs directly to an epic.
